Erosion protection for a new quay in Skellefteå

The new quay at Port of Skellefteå was protected against erosion using concrete mattresses and an underwater-cast concrete beam.

The customer's challenge

Larger vessels and risk of erosion from propeller wash

A new, longer and deeper quay is being built at Port of Skellefteå to accommodate larger vessels. As part of the expansion, the slope and seabed beneath and in front of the quay needed protection against erosion caused by propeller wash and waves.

On behalf of Peab Anläggning AB, Tecomatic took part in the design and carried out extensive erosion protection using concrete mattresses. As part of the project, Tecomatic also built an underwater-cast concrete beam that gives the erosion protection a tight and stable termination against the seabed along the outer row of piles.

Betongmadrasser utlagda i slänten längs kajens pålrad
Betongfyllda madrasser som erosionsskydd längs den nya kajen
Our solution

Erosion protection at depths down to 14 metres

The concrete mattress work was carried out underwater, around dense rows of piles and partly beneath the quay deck. The erosion protection extends from the shore zone at +2 metres down to a depth of approximately −14 metres.

The protection was adapted to depth and load, using three types of concrete mattresses: a lighter variant in the shore zone (UCS200), a medium variant on the slope (FP240) and the heaviest at the toe of the slope (UCS400), where the loads are greatest. Each area was surveyed on site, and the mattresses were then sewn to measure at Tecomatic’s production facility in Kalmar. They were then launched, positioned underwater and filled with low-carbon concrete.

Concrete mattresses adapt to uneven seabeds and can be fitted around piles and other structures, which made the method well suited to the project’s hard-to-reach areas.

COMPLEMENTARY SOLUTION

Underwater-cast beam completes the erosion protection

Along the outer row of piles, a tight and stable termination against the seabed was needed without reducing the water depth for vessels at the quay. Conditions were challenging, with loose sediment, limited underwater visibility and varying seabed conditions.

Tecomatic developed a solution with an approximately 280-metre-long concrete beam, cast directly underwater in nine stages. First, loose sediment was removed from the seabed by suction dredging. A concrete mattress formwork was then fitted against the piles and left in place as part of the structure. The reinforcement was prefabricated in Kalmar and lowered into position before the beam was cast with self-compacting concrete that flows out and fills the formwork underwater. By preparing as much as possible on land, the time spent working underwater was kept to a minimum.

Together, the concrete mattresses and the underwater-cast beam give the new quay continuous erosion protection from the shore zone down to the seabed. The quay can now accommodate larger vessels, with protection designed for the stronger propeller wash that comes with them.

Mobilkran håller betongslangen vid undervattensgjutning av balken längs kajens yttre pålrad

Key facts

Scope

  • approx. 8 900 m² concrete mattresses
  • approx. 1 750 m³ low-carbon concrete
  • approx. 280 linear metres underwater-cast beam
  • approx. 1 200 m² FP200 as permanent formwork
  • approx. 800 m³ underwater concrete
Gjutning av undervattensbalken längs kajens yttre pålrad

Contact us

Torbjörn Svensson

Business Area Manager Erosion Control

Oskar Spetsare

Head of Projects Erosion Control

Learn more about our customer solutions and products.