Take part of our customer case where Tecomatic has participated as a strategic partner and been involved in everything from planning to dismantling of our silt curtains.

The customer's challenge

Clouding work in fairway

Itinera was contracted to build the New Skuru Bridge in Skurusundet outside Stockholm. Typical challenges in this type of project are clouding work close to the water and bridge abutments. In addition, there was a high demand for specified rules for passing boat traffic, as the project was directly adjacent to a fairway with daily boat and ferry traffic.

Byggnation av den nya Skurubron. Man ser tydligt hur en siltgardin är monterad i vattnet och avgränsar arbetsområdet med grumlande arbete.
Our solution

Strategic partner - from planning stage to dismantling

Itinera chose to bring in Tecomatic as a strategic partner to plan as well as execute the environmental measures required in the project. We participated in the design work and produced the silt curtains according to the project’s requirements and assembled the system on site. In the course of the project, we allowed for entries and exits at both bridge piers. We also carried out supervision and inspections on selected occasions.

Upon completion of the project, we dismantled the silt curtains and ensured that no turbidity or sediment uptake occurred and took continuous turbidity measurements.

“We are very pleased with how Tecomatic performed the whole thing for us. They participated in a competent and professional way from the planning stage to manufacturing, assembly, checks and the final dismantling at the end of the project. I can really recommend working with Tecomatic.”


– Sandra Sandlöv, Quality & Environmental Engineer, Itinera

Facts and figures

  • Products: Silt curtains. Tecomatic was a strategic partner where we were involved from planning to dismantling the silt curtains at the end of the project. 
  • Customer: Itinera
  • Project start: 2020
  • Completed: Spring 2024
  • Location: Skurusundet, Nacka
Read more about Itinera on the Itinera website.
Vy mot gamla Skurubron. Siltgardin avgränsar arbetsområdet från färdleden.

Contact us

Emil Eriksson

Business Area Manager Water Treatment

Mikael Strand

Water treatment project manager

Learn more about our customer solutions and products.